Executive Summary

  • Many data centre operators are not fully prepared for AI’s growing electrical demands, as power-quality issues and skills shortages threaten expansion, according to a new study from Fluke
  • 78% of 1,300 operators report electrical disruption, while only one in three say their electrical infrastructure is ready for higher-density AI workloads
  • The skills shortage is acute; 60% say recruiting qualified electrical technicians has become more difficult, while 34% say skills shortages have delayed new capacity

 

More than three quarters of data centre respondents in a survey by test and measurement provider Fluke said they have experienced electrical or power system issues contributing to disruption, delays, downtime, or serious near-misses over the past year.

The survey polled 1,300 data centre industry operators and professionals across six countries, including the UK, and found wider shortages threaten expansion. 60% of those polled said recruiting qualified electrical technicians has become more difficult, while one in three say their electrical infrastructure is ready for higher-density AI workloads (33%).

Alongside this, 34% of respondents said electrical skills shortages have delayed infrastructure upgrades or new capacity, while 29% said power quality issues have reduced their ability to deploy or operate AI/GPU workloads.

Three quarters (76%) of those polled said access to sufficient power and grid capacity is either moderately or severely limiting their ability to expand. The challenge for the industry, Fluke noted, is ‘no longer simply securing power from the grid, but ensuring data centres have the infrastructure and expertise to turn that power into reliable computing capacity.’

“The industry has spent years asking where the power will come from. But our findings show that the focus should also be on how effectively data centres can use the power they already have,” said Parker Burke, president of Fluke. “As AI drives unprecedented demand for computing capacity, the electrical infrastructure inside data centres is becoming a critical bottleneck.

“Without addressing this last-mile challenge, the industry risks having the power to expand, but not the infrastructure to deliver,” Burke added.

Picture credit: Created with Magnific

SPONSORED AD

Related Articles

SPONSORED AD
Popular Topics
Artificial Intelligence
Cooling
Data Centre Design & Build
Data Centre Infrastructure & Management
Markets & Leadership
Uninterruptible Power & Backup Systems
Opinion
Featured Articles
Gridlock in the gigawatt era: navigating the US utility bottleneck
Gridlock in the gigawatt era: navigating the US utility bottleneck
Gridlock in the gigawatt era: navigating the US utility bottleneck
Featured Resources
Capacitor failure in UPS systems
Capacitor failure in UPS systems
Capacitor failure in UPS systems

Sponsored

How Reliable Is Your UPS Infrastructure?
Learn how capacitor failures affect UPS performance and discover ways to reduce infrastructure risk.
SPONSORED AD