Energy Storage Report

SPONSORED AD

Executive Summary

  • About 3,500 MW of battery capacity in Great Britain shares a grid connection with wind or solar and is owned by one of the nineteen companies ranked; only 255 MW of it is operating, 836 MW is under construction and 2,416 MW (69%) is consented but not started.
  • Ørsted ranks first (7.66) on its 300 MW Iceni battery at the Hornsea 3 converter station, ahead of RWE (7.39), Cero Generation (7.16) and Statkraft (7.10). Every company is scored the same way: on the capacity it owns, weighted by how far each battery has got, and on how firmly the public record shows the shared connection.
  • Future Outlook: with most of this capacity consented but not yet built, the order over the next few years will depend on which companies turn consents into operating batteries, as connections reform pushes some co-located batteries back to 2031-35 and sites keep changing hands. Rising constraint costs and the Clean Power 2030 range of 23 to 27 GW of battery storage by 2030 give the grid good reason to want those batteries next to wind and solar.

 

Share this Post:

Related Resources

SPONSORED AD
Popular Topics
Artificial Intelligence
Cooling
Data Centre Design & Build
Data Centre Infrastructure & Management
Markets & Leadership
Uninterruptible Power & Backup Systems
Opinion
Featured Articles
Gridlock in the gigawatt era: navigating the US utility bottleneck
Gridlock in the gigawatt era: navigating the US utility bottleneck
Gridlock in the gigawatt era: navigating the US utility bottleneck
Featured Resources
Capacitor failure in UPS systems
Capacitor failure in UPS systems
Capacitor failure in UPS systems

Sponsored

How Reliable Is Your UPS Infrastructure?
Learn how capacitor failures affect UPS performance and discover ways to reduce infrastructure risk.
SPONSORED AD